Our Process
Drawing to Completion
To help clients better understand our project workflow, below is an overview of our construction process.
1.Project Kickoff and Preliminary Quotation

First, the client contacts us via the provided contact information. Following initial discussions, the client submits preliminary architectural drawings and relevant requirement documents. The factory conducts a preliminary budget assessment based on the initial drawings and client specifications, and provides an initial quotation.

Cost
complimentary
Time
7-10 business days
2.Contract Signing and Detailed Design

If the customer has no objections to the preliminary quotation, both parties shall sign a preliminary contract, with the customer paying 3%-5% of the total contract amount as the project initiation fee.

Upon receipt of payment, the factory will commence modular detailed design work, specifically including:Detailed construction drawings;Material of list (BOM);formulation Material sample confirmation

Cost
3%-5% of contract sum amount
Time
2-4 weeks
3.Official Quote and Advance Payment

After completing all detailed design work, the factory submits a formal and comprehensive quotation to the customer.

Upon mutual agreement on the final quotation, the customer pays the remaining 25%-27% of the total contract value. This payment, combined with the initial advance payment, constitutes 30% of the total contract amount as the project advance payment. The factory then commences project execution.

Cost
25%-27% of contract sum amount
Time
7-10 business days
4.Production, Acceptance, and Final Payment

After completing all renovation work at the factory, the client is notified to conduct a pre-delivery inspection.

The client then dispatches professionals to the factory for inspection. Upon passing inspection, the client pays the final installment. After receiving the final payment, the factory arranges shipment and subsequent logistics.

Cost
final payment
Time
6-12 weeks
Please note: The time frames provided above are indicative only. We will provide you with detailed time frames specific to your project.
Frequently asked questions about our progress.
What’s the difference between modular buildings and traditional building?

The difference between traditional construction and modular construction is  the different construction ways.

 

For traditional construction, it takes the material to the site and is built by the workers. For modular building, it takes the material to the factory and is completed 90% by the workers in factory,then we transport it to the local and complete the remaining 10%. 


Are the permits and legal requirements the same as traditional buildings?

Correct – getting permits is very similar whether you’re constructing a modular home or a traditional conventional home. Your specific circumstances will determine if a planning permit is needed, and we’ve found that roughly 70% of projects require one. Additionally, every new home build – be it modular or conventional – must have a building permit.


How long does it take to build a modular home?

We can produce about 10 same steel structures per day. Not including the fitting-out. When finished steel structure. Only can we fit-out, install furniture, finish interior decoration, packing and shipping.so the production period of fitting-out is usually 2 months.


The advantages of modular construction?

It reduces on-site construction time and pollution; on-site assembly is quick, and it facilitates future maintenance and modifications.


How much the freight?

It costs 70 dollars per cubic meter.


All Faqs
Subscribe to our email newsletter for regular updates and exclusive content
Call for appointment

Contact:Miracle

Phone/Wechat/whatsapp:
+86 158-1484-7343

Emai:Miracle.wang@mz-mic.com

Factory and head office

0757-27737625

No.8 Mingyang Road, Hecang Industrial Zone, Mingcheng Town,Gaoming District, Foshan City, Guangdong Province, China

Copyright:Foshan Meizong Housing Technology Co., Ltd    
Subscribe to our email newsletter for regular updates and exclusive content
Melbourne Display Centre

+86 158-1484-7343

No.8 Mingyang Road, Hecang Industrial Zone, Mingcheng Town,Gaoming District, Foshan City, Guangdong Province, China

Factory and head office

0757-27737625

No.8 Mingyang Road, Hecang Industrial Zone, Mingcheng Town,Gaoming District, Foshan City, Guangdong Province, China

Copyright:Foshan Meizong Housing Technology Co., Ltd