We are a Chinese manufacturer of modular buildings. We specialise in the prefabrication of heavy steel and steelconcrete modular units, serving builders, developers and project teams across Australia, New Zealand, Europe and North America. We have successfully delivered projects in Perth, Melbourne, Adelaide, Brisbane, Auckland, Hamilton, Guam, Saipan, Mexico, Norway, Sweden and Papua New Guinea.
Our management system is certified to ISO 9001, ISO 14001 and ISO 45001. We hold the EN 1090 Factory Production Control certification for Europe and CSA W47.1 steel structure welding qualification for Canada. Materials are sourced in compliance with AS/NZS, SAA and WaterMark standards. NATAaccredited asbestosfree test reports are available upon request.
Our Modular Units
We manufacture integrated prefinished modular units, suitable for the following project types:
Multi-storey apartments & student accommodation
Townhouses & standalone homes
Hotels & holiday buildings
Hospitals, schools and commercial amenities
Maximum single module dimension: 17m × 4.6m × 4m Our projects range from singlestorey dwellings up to 20storey highrise modular buildings.
Production Capacity: Our dedicated production line can deliver up to 50 identical highrise modules per day. For mixed custom modules, the daily output is up to 20 units. Typically, around 80% of the work is completed in our factory. The remaining site installation, connections and finishing works are carried out by your local team.
We Help You Manage Three Key Project Risks
Builders and developers in Australia and New Zealand commonly face three major uncertainties when delivering modular projects:
1.Cost Risk: Uncontrolled extra costs caused by design changes after modules leave the factory.
2.Programme Risk: Delays arising from weather conditions, multi-trade coordination and variable on-site construction efficiency.
3.Compliance Risk: Imported modules must meet local building codes and approval requirements. Certification can only be finalised with sign-off from your local engineer.
Our full workflow is designed to identify and lock in these three risks at an early stage.
Cooperation and Delivery Process
We carry out module fabrication up to shipment based on the construction drawings confirmed by you:
Design Phase: Works are based on the construction drawings approved by you. An authorised collaborating structural engineer reviews the design to verify buildability of the modular solution and compliance with NCC requirements.
Material Phase: Structural steel, pipework, windows, doors, sanitary ware and electrical components are sourced from qualified suppliers complying with AS/NZS and SAA standards. Compliance documents are retained for every batch of raw materials and available for your audit at any time.
Production Phase: Modules are manufactured strictly in accordance with approved drawings and Australian construction codes. Our inhouse AS compliance quality inspectors sign off on each process, including steel connections and preembedded MEP services. An online quality control system allows you to track the fitout progress in real time.
Pre-shipment Inspection Phase: Your nominated local engineer is welcome to inspect and sign off at our factory. Remote review by an Australian building surveyor can also be arranged. A full compliance dossier will be delivered together with the shipment, including material certificates, production QC records and engineer review documents for your local approval application.
Standard Lead Time: Approximately 3–5 months after drawing confirmation (including 2 months for internal fitout, excluding sea freight). Reference Unit Rate: USD 800–1200 per ㎡, subject to design specification, load requirements and finish standards.
Project Track Record and Key Cooperation Terms
Delivered Projects: HKU Student Dormitory (1502 modules), Hamilton Townhouses in New Zealand (152 modules), Melbourne Townhouses (28 modules), 6 Apartment Buildings in New Zealand (66 modules), Papua New Guinea Hotel (94 modules / 3102 ㎡), Perth Holiday Camp (22 modules), and more.
Heavy Steel Frame System: Heavy steel frames are adopted for all highrise projects. Light gauge steel will not be used as a substitute. Structural tolerances and longterm performance are stable and predictable.
Release Approval Process: Modules can only leave our factory after inspection and signed approval by your authorised representative.
Traceable Compliance Chain: Full auditable documentation covering material certificates, production records and engineer review reports.
Low-Carbon Prefabrication Solution: Lowcarbon steel and concrete are selected. CNC machining reduces waste, process water is recycled, and onsite lifting and handling operations are optimised.
We accept projects of flexible scale, ranging from small single-unit developments to largescale projects with hundreds of modules.
Take a closer look at our collection of modular projects we have created for our clients, showcasing innovation, precision, and special style.
For this project,it constructed from 2024 to 2025. This project presents an overall minimalist and bright aesthetic. The window design is clean and simple, allowing natural light to flood in and making the rooms feel more open and airy. The entire space creates a comfortable, tidy, and practical living atmosphere.





